11% OFFWe cover the tax on every crack filling quote.Get yours

How it works

We clean out the crack first, then fill it with heated rubber sealant. As the rubber cools, it bonds to both sides of the crack and stays flexible enough to move with the seasons. Water can't get in. The crack stops growing. Your asphalt keeps doing its job.

Best time of year

Spring after the thaw shows you what winter did. Fall before the next winter locks the damage in. Saskatchewan crack-filling season runs from about May through October when surface temperatures are right for the sealant to bond properly.

What this saves you

A four-hundred-dollar crack-fill in October keeps a forty-thousand-dollar parking lot out of the wrecking yard. Every year you put it off, the cracks widen and branch. Eventually they get too big for sealant and you need patching. Then replacement. Don't wait.

What we handle under this service

  • Single straight cracks across your surface
  • Cracks where two pavement sections meet
  • Spider and alligator cracking, while still fillable
  • Driveways, parking lots, roads, and yards
  • Hot-pour rubber sealant
  • Cleaned, filled, and sealed in one visit
Request a written quote See our gallery
Free QuoteCall